Skip to main content
PLCXpert Wiki

Bently Nevada 3300 NSv Proximity Probes — 330910 Series Compared (Set 2)

24 models · Bently Nevada

AI-generated · verify with manufacturer

Bently Nevada 3300 NSv Proximity Probes — 330910 Series Compared (Set 2): side-by-side comparison of 24 sibling models from the same product line. Every value is extracted from the manufacturer documentation indexed in this wiki; a field shown as "Not available" is absent from the published source. Use the product links for full specifications, maintenance notes and sourcing guidance.

Specification comparison table

Bently Nevada 3300 NSv Proximity Probes — 330910 Series Compared (Set 2) — specifications compared across 24 models. Scroll horizontally to see all columns.
ModelAgency Approval OptionMaterialOverall Case Length OptionTemperatureTotal Probe LengthsUnthreaded Length OptionTotal Length Option
330910-02-10-70-01-00-00 Not requiredPolyphenylene sulfide (PPS).10-100 mmSchedule0.5, 1, 5,-02 - 20 mm-70 7.0 meters (23.0 feet)
330910-03-09-05-02-05-05 = Multiple ApprovalsPolyphenylene sulfide (PPS).-09=90 mmSchedule0.5, 1, 5,-03=30 mm-05 = 0.5 meter (20 in)
330910-03-20-05-11-00-00 - Not requiredPolyphenylene sulfide (PPS).20-200 mmSchedule0.5, 1, 5,-03- 30 mm-05 0.5 meter (20 in)
330910-03-20-10-11-00-00 - Not requiredPolyphenylene sulfide (PPS).-20- 200 mmSchedule0.5, 1, 5,-03 - 30 mmNot available
330910-03-20-50-11-00-00 - Not requiredPolyphenylene sulfide (PPS).20=200 mmSchedule0.5, 1, 5,-03=30 mm50= 5.0 meters (16.4 feet)
330910-03-20-70-11-00-00 - Not requiredPolyphenylene sulfide (PPS).20=200 mmSchedule0.5, 1, 5,-03=30 mm70= 7.0 meters (23.0 feet)
330910-05-09-05-01-CN-CN=Country SpecificPolyphenylene sulfide (PPS).09=90 mmSchedule0.5, 1, 5,-05 =50 mm-05 0.5 meter (20 in)
330910-05-09-10-01-CN-CN Country SpecificPolyphenylene sulfide (PPS).09-90 mmSchedule0.5, 1, 5,-05 - 50 mm-10 - 1.0 metre (39 in)
330910-05-09-50-01-CN-CN=Country SpecificPolyphenylene sulfide (PPS).09=90 mmSchedule0.5, 1, 5,-05=50 mm50= 5.0 meters (16.4 feet)
330910-05-09-70-01-CN-CN = Country SpecificPolyphenylene sulfide (PPS).09=90 mmSchedule0.5, 1, 5,-05=50 mm70= 7.0 meters (23.0 feet)
330910-05-11-10-02-00-00 Not requiredPolyphenylene sulfide (PPS).-11 =110 mmSchedule0.5, 1, 5,-05=50 mm-10 = 1.0 meter (39 in)
330910-05-25-10-02-00-00 Not requiredPolyphenylene sulfide (PPS).-25 - 250 mmSchedule0.5, 1, 5,-05 -50 mm-10 = 1.0 meter (39 in)
330910-06-13-10-01-CNCN = Country SpecificPolyphenylene sulfide (PPS).-13 =130 mmSchedule0.5, 1, 5,-06=60 mm-10 = 1.0 meter (39 in)
330910-06-25-05-11-00-00 - Not requiredPolyphenylene sulfide (PPS).25-250 mmSchedule0.5, 1, 5,-06 - 60 mm-05 0.5 meter (20 in)
330910-06-25-10-11-00-00 - Not requiredPolyphenylene sulfide (PPS).-25- 250 mmSchedule0.5, 1, 5,-06 - 60 mm-10 - 1.0 metre (39 in)
330910-06-25-50-11-00-00 - Not requiredPolyphenylene sulfide (PPS).25=250 mmSchedule0.5, 1, 5,-06=60 mm50= 5.0 meters (16.4 feet)
330910-06-25-70-11-00-00 - Not requiredPolyphenylene sulfide (PPS).25=250 mmSchedule0.5, 1, 5,-06=60 mm70= 7.0 meters (23.0 feet)
330910-07-23-05-02-00-00 - Not requiredPolyphenylene sulfide (PPS).23=230 mmSchedule0.5, 1, 5,-07 - 70 mm-05 0.5 meter (20 in)
330910-07-23-10-02-00-00 - Not requiredPolyphenylene sulfide (PPS).23-230 mmSchedule0.5, 1, 5,-07 - 70 mm-10 - 1.0 metre (39 in)
330910-07-23-50-02-00-00 - Not requiredPolyphenylene sulfide (PPS).23=230 mmSchedule0.5, 1, 5,-07=70 mm50= 5.0 meters (16.4 feet)
330910-07-23-70-02-00-00 - Not requiredPolyphenylene sulfide (PPS).23=230 mmSchedule0.5, 1, 5,-07=70 mm70= 7.0 meters (23.0 feet)
330910-10-22-10-01-CN-CN=Country SpecificPolyphenylene sulfide (PPS).-22 - 220 mmSchedule0.5, 1, 5,-10 =100 mm-10 = 1.0 meter (39 in)
330910-14-19-10-02-00-00 Not requiredPolyphenylene sulfide (PPS).-19 =190 mmSchedule0.5, 1, 5,-14=140 mm-10 = 1.0 meter (39 in)
330910-16-23-10-02-00-00 Not requiredPolyphenylene sulfide (PPS).-23 - 230 mmSchedule0.5, 1, 5,-16 -16 0 mm-10 = 1.0 meter (39 in)

Values reproduced from manufacturer datasheets. "Not available" means the field is absent from the published source document. Always confirm critical parameters with the original documentation before specification.

More comparisons